Unplanned Maintenance Activity on the Collaborative Data Access Service – 17 July 2026

Dear Users, Please be informed that a maintenance required to ensure data timeliness reliability will take place tomorrow, Friday 17 July 2026, from 08:00 UTC to 9:00 UTC.  During this maintenance window, a temporary delay in the availability of Sentinel-1C and Sentinel-1D products may occur. All other services are expected to remain operational. We apologize …

Infrastructure Maintenance Activity on the Copernicus Data Access Service – 9 July 2026

Dear Users, Please be informed that a scheduled infrastructure maintenance activity will take place on Thursday, 9 July 2026, from 08:00 UTC to 11:00 UTC.  During this maintenance window, a temporary delay in the availability of Sentinel-1C, Sentinel-3 and Sentinel-5P products may occur. All other services are expected to remain operational. We apologize for any …

Sentinel-2: S2A Nighttime Campaign on 23 July 2026

A second S2A nighttime campaign is planned to start on 23rd of July and last for 20 days. The applicable mission planning should be sent the 20th or 21st of July. All acquisitions will be performed in INS-RAW mode, The production service should not generate L2A product level for INS-RAW acquisitions from 23rd of July throughout the end …

Copernicus Sentinel-3A unavailability notice for Trickle Dump data gaps occurred on 29 June 2026

Due to the Sentinel-3A trickle dump activity, MWR data degradation occurred for sensing time from 29/06/2026-08:47:42 to 29/06/2026-12:17:41, SLSTR data degradation occurred for sensing time from 29/06/2026-08:55:09 to 29/06/2026-12:17:41, OLCI data degradation occurred for sensing time from 29/06/2026-08:55:13 to 29/06/2026-12:17:42, SRAL data degradation occurred for sensing time from 29/06/2026-08:55:13 to 29/06/2026-12:17:42. We apologize for any inconvenience this may have caused.

Copernicus Sentinel-3B Unavailability Notice for Lunar Calibration planned on 30/06/2026

Due to a Copernicus Sentinel-3B Lunar Calibration: SLSTR products degradation is expected for sensing time from 30/06/2026-11:55:49 to 30/06/2026-12:46:19 UTC, MWR products degradation is expected for sensing time from 30/06/2026-11:55:49 to 30/06/2026-12:46:19 UTC, SRAL products degradation is expected for sensing time from 30/06/2026-11:56:49 to 30/06/2026-12:28:09 UTC,  DORIS products degradation is expected for sensing time from 30/06/2026-11:56:49 to 30/06/2026-12:28:09 UTC, OLCI products degradation is expected for sensing time from 30/06/2026-12:40:32 to 30/06/2026-12:46:19 UTC.

Infrastructure Maintenance Activity on the Copernicus Data Access Service – 23 June 2026

Dear Users, Please be informed that a scheduled infrastructure maintenance activity will take place on Tuesday, 23 June 2026 from 08:00 UTC to 10:00 UTC. During this maintenance window, a temporary delay in the availability of Sentinel-1D products may occur. All other services are expected to remain operational. We apologize for any inconvenience this may …

Sentinel-1 orbital reconfiguration dates

With the consecutive successful launches of Sentinel-1C in December 2024 and Sentinel-1D in November 2025, the replenishment of the first-generation satellites is nearly complete. After an interim phase with the three Sentinel-1 satellites in operations, started on 17th April 2026, Sentinel-1A operations will be terminated with the take-over of the new Sentinel-1D unit. This will …